师傅轻点灬太粗嗯太深了用力小说_我的青春期高清免费观看_欧美精品中文字幕一区二区_公么大龟弄得我好舒服秀婷_欧美精品久久久久a片密桃_365天今时之欲在线观看_《妈妈的外遇》免费观看全集_亚洲欧美三级片免费_校园全肉高h湿

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator installation precautions

皮囊式蓄能器2.jpg

 

The accumulator should be installed at a convenient location for inspection and maintenance. When used to absorb shock and pulsation, the accumulator should be close to the vibration source, and should be installed in the place where the impact is easy. The installation position should be away from the heat source to prevent the system pressure from rising due to the thermal expansion of the gas.


The accumulator must be securely fastened but not allowed to be welded to the main unit and should be securely supported on the bracket or on the wall. When the diameter ratio is too large, hoop reinforcement should also be provided.


In principle, the capsule accumulator should be installed vertically downwards. When tilting or horizontally mounted, the bladder is in contact with the shell by buoyancy, which hinders normal telescopic operation, accelerates the damage of the bladder, and reduces the risk of accumulator function. . Therefore, the method of tilting or horizontal mounting is generally not used. There are no special installation requirements for diaphragm accumulators, and the oil ports can be installed vertically, tilted or horizontally downwards.


A check valve should be installed between the pump and the accumulator to prevent the oil in the accumulator from flowing back into the pump and returning to the tank when the pump stops working, causing an accident.